Laboratory Use Concrete Testing Twin Shaft Mixer
- Product Description
Laboratory Use Concrete Testing Twin Shaft Mixer
Thisnew type concrete mixeris for lab testing use.It can mix the test standard of gravel, sand, cement and water mixture tobeuniform concrete material, for the determination of normal consistency, setting time and cement production stability of block;It is the indispensable equipmentat laboratory for cement production enterprises, construction enterprises, colleges and universities, scientific research units and quality supervision departments;It can also be applied to other granular materials under 40 mm mixing.
HJS-60 Mobile double-horizontal shafts Concrete Mixer (Twin Shaft Mixer)
The tectonic type of this machine has been included into national compulsory industry
<Concrete Test Mixer Standards> (JG244-2009).The performance of this product meets or even exceeds the standards. Due to its scientific design, strict quality control and unique tectonic type, this mixer of double-horizontal shafts features efficient mixing ,well-distributed mixture, and cleaner discharging and it is suitable for Institutes of scientific researches, mixing plant, detection units, as well as laboratory of concrete.
Technical Parameters:
1. Tectonic Type: Double-horizontal shafts
2. Output Capacity: 60L ( input capacity is more than 100L)
3.Work voltage:three-phase,380V/50HZ
4. Mixing Motor Power: 3.0KW,55±1r/min
5. Unloading Motor Power: 0.75KW
6. Material of work chamber: high quality steel,10mm thickness.
7. Mixing Blades: 40 Manganese Steel (casting),Thickness of Blade: 12mm
If they wear out, they can be taken down.and replace with new blades.
8.Distance between Blade and inner chamber: 1mm
Big stones cann’t be stuck,if small stones go into the distance can be crushed when mixing.
9.Unloading:Chamber can be stay at any angle,it is convenient for unloading.When chamber turn 180 degrees,then press mixing button,all materials goes down,it is easy for cleaning.Press reset,the chamber turns to normal and stop automatically.
10.Timer: with timer function(factory setting is 60s).within 60 seconds the concrete mixture can be mixed into homogeneous fresh concrete.
11. Overall Dimensions: 1100×900×1050mm
12.Weight: about 700kg
13. Packing: wooden case
Every mixer is with a concrete unloading trolley.
1.structure and principle
Mixer is double shaft type, mixing chamber main body is double cylinders combination. To achieve satisfactory result of mixing, mixing blade is designed to be falciform, and with scrapers on both end sides blades. Each stirring shaft installed 6 mixing blades, 120 ° Angle spiral uniform distribution, and the stirring shaft Angle of 50 ° installation. Blades are overlapping sequence on the two stirring shafts, reverse outward mixing, can make the material to clockwise circulate at the same time of forced mixing, achieve the goal of mixing well. The installation of the mixing blade adopts the method of thread locking and welding fixed installation, guarantee tightness of blade, and also can be replaced after the wear and tear. Unloading is with 180 ° tilting discharge. Operation adopts the combination design of manual open and limit control. mixing time can be set in a limited time.
Mixer is mainly composed of retarding mechanism, mixing chamber, worm gear pair, gear, sprocket, chain and bracket, etc. Through the chain transmission, the machine mixing pattern for motor drive axle shaft cone drive, cone by gear and chain wheel drives the stirring shaft rotation, mixing materials. Unloading transmission form for motor through a belt drive reducer, reducer by chain drive stirring the rotate, flip and reset, unload the material.
The machine adopts three axis transmission design, the main transmission shaft is in the middle of the position of the mixing chamber both sides plates, so that increases the stability of the machine when working; Turn 180 ° when discharging, the drive shaft force is small, and occupied area is small. All the parts after precision machining, interchangeable and general, easy disassembly, repair and replacement blades for vulnerable parts. The driving is fast, reliable performance, durable.
5.Check before use
(1).Place the machine to a reasonable position, lock the universal wheels on the equipment, adjust the equipment anchor bolt, so that it is fully contacted with the ground.
(2).In accordance with the procedures “六, operation and use” no-load check machine, must be running normally. The connection parts no loose phenomenon.
(3).Confirm the mixing shaft rotates outward. If wrong, please change the phase wires, to ensure that the mixing shaft rotate outward.
6.Operation and use
(1).Connect the power plug to the power socket.
(2).Switch on ” air switch ” , the phase sequence testing works. If the phase sequence errors ,’ phase sequence error alarm’ will alarm and lamp flashing. At this time, you should cut the input power and adjust any two fire wires position of the input power cord.(note: cann’t adjust the phase sequence in the equipment controller) if “phase sequence error alarm” don’t alarm that phase sequence is correct, can be normal use.
(3). Check whether the ” emergency stop” button is open, please reset it if open (rotate according to the direction indicated by the arrow).
(4).Put the Material to the mixing chamber, cover the upper cover.
(5).Set mixing time (factory default is one minute,commonly don’t need to set).
(6).Press the button “Mix start”, mixing motor begins to work, reach to the setting time (factory default is one minute), machine stop working, finish mixing. If you want to stop in the process of mixing, can press the “Mix stop” button.
(7).Take off the cover after mixing stops, place the trolley at below center position of the mixing chamber, and push the tight, lock the universal wheels of the trolley.
(8).Press the “Unload ” button, “unload” indicator light on at the same time. Mixing chamber turn 180 ° automatically stop, “unload ” indicator light is off at the same time, the most material discharged.
(During the unloading process, you can press the ‘emergency stop’ button to stop the chamber at a certain angle. Reset the ‘emergency stop’ button, press ‘unload start’ to continue unloading, or press ‘Reset Start’ returns to the starting position.)
(9).Press the “Mix start” button, the mixing motor works, clear the residual material clean (need about 10 seconds).
(10).Press the “Mix stop ” button, mixing motor stops working.
(11).Press the “reset ” button, discharging motor running reversely, the “reset” indicator light bright at the same time, the mixing chamber turn 180 ° and automatically stop, the ” reset ” indicator light off at the same time.
(12).Clean the chamber and blades to prepare mixing next time.
Note: (1)In the machine running process in case of emergency, please press the emergency stop button to ensure the personal safety and avoid the damage of equipment.
(2) When input the cement, sand and gravel, it is forbidden to mingle with the nails, iron wire and other metal hard objects, so as not to damage the machine.
7.Transportation and installation
(1)Transportation: this machine without lifting device. transportation should use the forklift for loading and unloading. There are turning wheels below the machine, and it can be pushed by hand after landing.(2)Installation: the machine doesn’t need special foundation and anchor bolt, simply place the equipment on the cement platform, screw the two anchor bolts at the bottom of machine to ground support.(3)Ground: in order to fully ensure the safety of electricity, please connect the grounding column behind the machine with the ground wire, and install electric leakage protection device.
8.maintenance and preservation
(1) the machine should be placed in the environment without strong corrosive medium.(2) After using, clean the interior parts in the mixer tank with clear water.(If don’t use for a long time, can coat rust-proof oil on the mixing chamber and the blade surface)(3) before use, should check whether the fastener is loose, in case loose should tighten timely.(4) When turning on the power supply, should avoid any part of the human body directly or indirectly touch with mixing blades.(5) mixing motor reducer, chain, and each bearing should regularly or timely fill oil, ensure lubrication, oil is 30 # engine oil.
Related product:
1.Service:
a.If buyers visit our factory and check the machine, we will teach you how to install and use the
machine,
b.Without visiting, we will send you user manual and video to teach you to install and operate.
c.One year guarantee for whole machine.
d.24 hours technical support by email or calling
2.How to visit your company?
a.Fly to Beijing airport:By high speed train From Beijing Nan to Cangzhou Xi (1 hour), then we can
pick up you.
b.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours),
then we can pick up you.
3.Can you be responsible for transport?
Yes,please tell me the destination port or address.we have rich experience in transport.
4.You are trade company or factory?
we have own factory.
5.What can you do if the machine broken?
The buyer send us the photos or videos. We will let our engineer to check and provide professional suggestions. If it needs change parts, we will send the new parts only collect cost fee.