1. Before installing the vibrating table, lay the foundation first. When laying the foundation, level the upper plane horizontally, and bury the fixing bolts according to the bolt holes of the chassis, then install them. The fixing bolts must be tightened during installation.
2. When the vibration table is testing after installing, first drive for 3-5 minutes, then stop and check all the fastening bolts. If it is loose, tighten it, then it can be used.
3. During the vibrating table, the concrete products should be firmly on the vibrating table. The required products should be placed symmetrically with the table top to balance the load, and the fastening device of the vibrating product should be designed by the user and according to his own needs.
4. The vibrator bearing should be inspected frequently, and periodically removed and replaced, the lubricant should be replaced, the bearing should be well lubricated, and the life of the vibrator should be prolonged.
5. The vibrating table should have a reliable grounding wire to ensure safety.
Items | Type A:50x50mm | Type A:80x80mm | Type A:1000x1000mm |
Table size | 500x500mm | 800x800mm | 1000x1000mm |
vibration frequency | 2860 time/m | 2860 time/m | 2860 time/m |
amplitude | 0.3-0.6mm | 0.3-0.6mm | 0.3-0.6mm |
Vibrator power | 0.55Kw | 1.5Kw | 1.5Kw |
Maximum load | 100Kg | 200Kg | 200Kg |
Voltage | 220V/380V choice | 220V/380V choice | 220V/380V choice |
1.Service:
a.If buyers visit our factory and check the machine, we will teach you how to install and use the
machine,
b.Without visiting, we will send you user manual and video to teach you to install and operate.
c.One year guarantee for whole machine.
d.24 hours technical support by email or calling
2.How to visit your company?
a.Fly to Beijing airport:By high speed train From Beijing Nan to Cangzhou Xi (1 hour), then we can
pick up you.
b.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours),
then we can pick up you.
3.Can you be responsible for transport?
Yes,please tell me the destination port or address.we have rich experience in transport.
4.You are trade company or factory?
we have own factory.
5.What can you do if the machine broken?
The buyer send us the photos or videos. We will let our engineer to check and provide professional suggestions. If it needs change parts, we will send the new parts only collect cost fee.
Post time: May-25-2023